NOTES: These eight 23-storey tower blocks were built with the Larsen-Neilsen system, which had been used at Ronan Point. Following the collapse of Ronan Point in 1968, these blocks were earmarked for demolition, which was finally carried out after 1986.
NOTES: The Kingsway tunnel ventilation shafts are two identical structures on the opposite sides of the Mersey which provide ventilation for the Kingsway road tunnel. They were completed in 1971 when the Kingsway tunnel was completed between Liverpool and Wallasey.
NOTES: The Kingsway tunnel ventilation shafts are two identical structures on the opposite sides of the Mersey which provide ventilation for the Kingsway road tunnel. They were completed in 1971 when the Kingsway tunnel was completed between Liverpool and Wallasey.