Welcome to RIBApix!
You have no items in your basket.
Close
Filters
Search

Power stations

View as Grid List
Sort by

Design for a small power house with a conical roof in the grounds of Cour House, Kintyre, Argyll, for the Nickerson family: perspectives and plans of the round structure

RIBA36003
Hill, Oliver (1887-1968)
NOTES: Cour House was the first country house to be built from Oliver Hill's designs.

Battersea Power Station, London

RIBA41199
Halliday, James Theodore (1882-1932)
NOTES: The first phase was completed in 1933. The second two chimneystacks were added between 1944 and 1955.

Designs for Battersea Power Station, London: west elevation

RIBA41518
Scott, Halliday & Agate
NOTES: The first phase was completed in 1933. The second two chimneystacks were added between 1944 and 1955.

Designs for Battersea Power Station, London: north elevation to the River Thames

RIBA41519
Scott, Halliday & Agate
NOTES: The first phase was completed in 1933. The second two chimneystacks were added between 1944 and 1955.

Designs for Battersea Power Station, London: south elevation with an isometric projection of one of the chimney tower bases

RIBA41520
Scott, Halliday & Agate
NOTES: The first phase was completed in 1933. The second two chimneystacks were added between 1944 and 1955.

Designs for Battersea Power Station, London: revised elevation and plan for one of the chimney tower bases

RIBA41521
Scott, Halliday & Agate
NOTES: The first phase was completed in 1933. The second two chimneystacks were added between 1944 and 1955.

Former electrical substation for the Zeppelinfeld (Nazi Party Rally Grounds), Nuremberg

RIBA41982
Speer, Albert (1905-1981)
NOTES: This building currently houses a fast-food restaurant.

Former electrical substation for the Zeppelinfeld (Nazi Party Rally Grounds), Nuremberg: detail of doorway and removed sculptural decoration

RIBA41983
Speer, Albert (1905-1981)
NOTES: This building currently houses a fast-food restaurant.

Battersea Power Station, London: Battersea 'A' power station with London Power Company colliers Alexander Kennedy and John Hopkinson unloading coal

RIBA45437
Halliday, James Theodore (1882-1932)
NOTES: The first phase was completed in 1933. The second two chimneystacks were added between 1944 and 1955.

Battersea Power Station, London: model

RIBA45438
Halliday, James Theodore (1882-1932)
NOTES: The first phase was completed in 1933. The second two chimneystacks were added between 1944 and 1955.

Battersea Power Station, London: the turbine hall and no. 1 turbine block of Battersea 'A' under construction

RIBA45439
Halliday, James Theodore (1882-1932)
NOTES: The first phase was completed in 1933. The second two chimneystacks were added between 1944 and 1955.

Battersea Power Station, London: Battersea 'A' under construction

RIBA45440
Halliday, James Theodore (1882-1932)
NOTES: The first phase was completed in 1933. The second two chimneystacks were added between 1944 and 1955.
Categories
)
CLOSE