Welcome to RIBApix!
You have no items in your basket.
Close
Filters
Search

New towns

View as Grid List
Sort by

Binsey Walk, Southmere, Thamesmead, London

RIBA113798
Greater London Council. Department of Architecture & Civic Design
NOTES: Thamesmead was planned in 1965-1966 as a new town on the riverside marshes of south-east London between Plumstead and Erith. It was scheduled for completion in 1974 but was never fully finished and the projected population of 60,000 for the new town was downgraded to 45,000 by the end of the 1970s. From then around 400 houses were being built annually and by 1982, the population stood at 20,000. Since 2014 the managment and regeneration of the area has come under the aegis of Peabody.

Housing, Thamesmead, London: the maisonette blocks seen from the street

RIBA113799
Greater London Council. Department of Architecture & Civic Design
NOTES: Thamesmead was planned in 1965-1966 as a new town on the riverside marshes of south-east London between Plumstead and Erith. It was scheduled for completion in 1974 but was never fully finished and the projected population of 60,000 for the new town was downgraded to 45,000 by the end of the 1970s. From then around 400 houses were being built annually and by 1982, the population stood at 20,000. Since 2014 the managment and regeneration of the area has come under the aegis of Peabody.

Housing, Maran Way, Thamesmead, London: the linking walkways

RIBA113800
Greater London Council. Department of Architecture & Civic Design
NOTES: Thamesmead was planned in 1965-1966 as a new town on the riverside marshes of south-east London between Plumstead and Erith. It was scheduled for completion in 1974 but was never fully finished and the projected population of 60,000 for the new town was downgraded to 45,000 by the end of the 1970s. From then around 400 houses were being built annually and by 1982, the population stood at 20,000. Since 2014 the managment and regeneration of the area has come under the aegis of Peabody.

Buckwheat Court, Thamesmead, London

RIBA113801
Greater London Council. Department of Architecture & Civic Design
NOTES: Thamesmead was planned in 1965-1966 as a new town on the riverside marshes of south-east London between Plumstead and Erith. It was scheduled for completion in 1974 but was never fully finished and the projected population of 60,000 for the new town was downgraded to 45,000 by the end of the 1970s. From then around 400 houses were being built annually and by 1982, the population stood at 20,000. Since 2014 the managment and regeneration of the area has come under the aegis of Peabody.

Buckwheat Court, Thamesmead, London: the ramped entrance to one of the lower blocks

RIBA113802
Greater London Council. Department of Architecture & Civic Design
NOTES: Thamesmead was planned in 1965-1966 as a new town on the riverside marshes of south-east London between Plumstead and Erith. It was scheduled for completion in 1974 but was never fully finished and the projected population of 60,000 for the new town was downgraded to 45,000 by the end of the 1970s. From then around 400 houses were being built annually and by 1982, the population stood at 20,000. Since 2014 the managment and regeneration of the area has come under the aegis of Peabody.

Housing, Thamesmead, London: the rear of the maisonette blocks

RIBA113803
Greater London Council. Department of Architecture & Civic Design
NOTES: Thamesmead was planned in 1965-1966 as a new town on the riverside marshes of south-east London between Plumstead and Erith. It was scheduled for completion in 1974 but was never fully finished and the projected population of 60,000 for the new town was downgraded to 45,000 by the end of the 1970s. From then around 400 houses were being built annually and by 1982, the population stood at 20,000. Since 2014 the managment and regeneration of the area has come under the aegis of Peabody.

Housing, Mangold Way, Thamesmead, London

RIBA113804
Greater London Council. Department of Architecture & Civic Design
NOTES: Thamesmead was planned in 1965-1966 as a new town on the riverside marshes of south-east London between Plumstead and Erith. It was scheduled for completion in 1974 but was never fully finished and the projected population of 60,000 for the new town was downgraded to 45,000 by the end of the 1970s. From then around 400 houses were being built annually and by 1982, the population stood at 20,000. Since 2014 the managment and regeneration of the area has come under the aegis of Peabody.

Housing, Mangold Way, Thamesmead, London: the maisonette block

RIBA113805
Greater London Council. Department of Architecture & Civic Design
NOTES: Thamesmead was planned in 1965-1966 as a new town on the riverside marshes of south-east London between Plumstead and Erith. It was scheduled for completion in 1974 but was never fully finished and the projected population of 60,000 for the new town was downgraded to 45,000 by the end of the 1970s. From then around 400 houses were being built annually and by 1982, the population stood at 20,000. Since 2014 the managment and regeneration of the area has come under the aegis of Peabody.

Housing, Thamesmead, London

RIBA113806
Greater London Council. Department of Architecture & Civic Design
NOTES: Thamesmead was planned in 1965-1966 as a new town on the riverside marshes of south-east London between Plumstead and Erith. It was scheduled for completion in 1974 but was never fully finished and the projected population of 60,000 for the new town was downgraded to 45,000 by the end of the 1970s. From then around 400 houses were being built annually and by 1982, the population stood at 20,000. Since 2014 the managment and regeneration of the area has come under the aegis of Peabody.

Housing, Thamesmead, London: the maisonette block

RIBA113807
Greater London Council. Department of Architecture & Civic Design
NOTES: Thamesmead was planned in 1965-1966 as a new town on the riverside marshes of south-east London between Plumstead and Erith. It was scheduled for completion in 1974 but was never fully finished and the projected population of 60,000 for the new town was downgraded to 45,000 by the end of the 1970s. From then around 400 houses were being built annually and by 1982, the population stood at 20,000. Since 2014 the managment and regeneration of the area has come under the aegis of Peabody.

Housing, Thamesmead, London: looking towards one of the elevated walkways

RIBA113808
Greater London Council. Department of Architecture & Civic Design
NOTES: Thamesmead was planned in 1965-1966 as a new town on the riverside marshes of south-east London between Plumstead and Erith. It was scheduled for completion in 1974 but was never fully finished and the projected population of 60,000 for the new town was downgraded to 45,000 by the end of the 1970s. From then around 400 houses were being built annually and by 1982, the population stood at 20,000. Since 2014 the managment and regeneration of the area has come under the aegis of Peabody.

Housing, Thamesmead, London: the elevated walkway

RIBA113809
Greater London Council. Department of Architecture & Civic Design
NOTES: Thamesmead was planned in 1965-1966 as a new town on the riverside marshes of south-east London between Plumstead and Erith. It was scheduled for completion in 1974 but was never fully finished and the projected population of 60,000 for the new town was downgraded to 45,000 by the end of the 1970s. From then around 400 houses were being built annually and by 1982, the population stood at 20,000. Since 2014 the managment and regeneration of the area has come under the aegis of Peabody.
Close
)
CLOSE