NOTES: The buildings included in the first stage of development of the airport, completed in 1958, were the terminal building, operations blocks, centre pier and control tower. The second stage of development, completed in 1965, included the addition of the north and south piers and the replanning and rebuilding internally of the terminal buildings.
NOTES: The buildings included in the first stage of development of the airport, completed in 1958, were the terminal building, operations blocks, centre pier and control tower. The second stage of development, completed in 1965, included the addition of the north and south piers and the replanning and rebuilding internally of the terminal buildings.
NOTES: Commissioned by the 3rd Earl Grosvenor (later the 1st Duke of Westminster from 1874), this lavish mansion was designed to display his enormous wealth. It comprised 150 bedrooms, massive stables, huge kennels and a chapel. Deemed too costly and large to maintain by the trustees of the Westminster estate, the mansion was demolished in 1961, leaving only the chapel and the stable block. A smaller house was built on the edge of the footprint of the old building in 1967.