Penguin Pool, London Zoo, Regent's Park, London: ramps under construction

RIBA Ref No RIBA2845-23
Architect/DesignerLubetkin Drake & Tecton
Artist/PhotographerHavinden, John (1908-1987)
CountryUK: England
CityLondon
Subject Date1934
Image Date1933
ViewExterior
StyleModern Movement
MediumPhotoprint
Library Reference5028/3
OrientationLandscape
Colour InfoBlack and white
CreditRIBA Collections
SubjectZoo buildings ; Modernism: Modernist Materials ; Construction sites ; Concrete
NOTES: This was Tecton's second commission for the Royal Zoological Society, the site consisting of a series of derelict ponds and a paddock. A dramatic design was needed to show off the antics of the penguins and this was achieved by two cantilevered ramps spiralling around one another without any intermediate support. The surrounding trees were kept and a cover provided around part of the elliptical structure to protect the penguins from the sun. The flat paths were coated with plastic rubber, the steps were of slate and the concrete ramps were kept wet by a revolving fountain. The structure was allowed under a clause in the London Building Act which exempted from the regulations buildings under a certain size which were not destined for human habitation and which were more than 30 ft from any other building. The pool had been allowed to fall into a state of disrepair after the Royal Zoological Society encountered strong opposition to its plans for major alterations in 1951. The pool was listed in 1970 and restored in 1988. The executive architects were Lubetkin and Drake.
*

Please describe how you will use the image including publication or exhibition title.

+ -
*
*
*
Customers who bought this item also bought

Penguin Pool, London Zoo, Regent's Park, London: model of the pool with penguins

RIBA2844-23
Lubetkin Drake & Tecton
NOTES: This was Tecton's second commission for the Royal Zoological Society, the site consisting of a series of derelict ponds and a paddock. A dramatic design was needed to show off the antics of the penguins and this was achieved by two cantilevered ramps spiralling around one another without any intermediate support. The surrounding trees were kept and a cover provided around part of the elliptical structure to protect the penguins from the sun. The flat paths were coated with plastic rubber, the steps were of slate and the concrete ramps were kept wet by a revolving fountain. The structure was allowed under a clause in the London Building Act which exempted from the regulations buildings under a certain size which were not destined for human habitation and which were more than 30 ft from any other building. The pool had been allowed to fall into a state of disrepair after the Royal Zoological Society encountered strong opposition to its plans for major alterations in 1951. The pool was listed in 1970 and restored in 1988. The executive architects were Lubetkin and Drake.

Penguin Pool, London Zoo, Regent's Park, London: the elliptical pool and ramp

RIBA60654
Lubetkin Drake & Tecton
NOTES: This was Tecton's second commission for the Royal Zoological Society, the site consisting of a series of derelict ponds and a paddock. A dramatic design was needed to show off the antics of the penguins and this was achieved by two cantilevered ramps spiralling around one another without any intermediate support. The surrounding trees were kept and a cover provided around part of the elliptical structure to protect the penguins from the sun. The flat paths were coated with plastic rubber, the steps were of slate and the concrete ramps were kept wet by a revolving fountain. The structure was allowed under a clause in the London Building Act which exempted from the regulations buildings under a certain size which were not destined for human habitation and which were more than 30 ft from any other building. The pool had been allowed to fall into a state of disrepair after the Royal Zoological Society encountered strong opposition to its plans for major alterations in 1951. The pool was listed in 1970 and restored in 1988. The executive architects were Lubetkin and Drake. This photograph comes from the archive of Carl Franck who was a member of Tecton at the time.